Dell PowerEdge C1100: 1 2 3
1 2 3: Dell PowerEdge C1100
Table of contents
- Notes, Cautions, and Warnings
- Installation and Configuration Unpacking the System Installing the Tooled Rail Solution
- 1 Install the sliding rails into the rack. 2
- 3 Installing the Tool-less Rail Solution
- 1 2 3
- 4 5
- 6 Optional – Connecting the Keyboard, Mouse, and Monitor
- Connecting the Power Cable(s) Securing the Power Cable(s)
- Turning On the System Complete the Operating System Setup
- Supported Operating Systems Other Information You May Need
- Technical Specifications Processor Expansion Bus Memory Drive
- Connectors Video Power
- Physical Environmental
- Environmental (continued)

1
Align the end pieces of the rails on the vertical rack flanges to seat the
pegs in the bottom hole of the first U and the top hole of the second U,
and engage the back end of the rail until the latch locks in place.
NOTE: The rails can be used in both square- and round-hole racks.
2
Repeat these steps to position and seat the front end piece on
the vertical flange.
3
To remove the rails, pull on the latch release button on the end piece
midpoint and unseat each rail.
6 Getting Started With Your System
Top 10 manuals
100.00
NZXT HALE90 1000W99.99
Samsung SM-R38099.97
AEG BSB 18C99.97
Dell 2700W99.97
Smeg KSEC70X99.96
Beurer HDE 4099.96
Pyramida KH 50 v.299.96
MSI CSM-H81M-P3299.96
AEG HR 562799.95
Melissa 640-048
