- Attaching the R ails to the Rack
- Installing and Securing the Cabinet
- Installing the Battery Tray
- Installing the UPS Front Cover Connecting the Equipment
- Connecting the Power Cord
- Starting the UPS Completing the Startup

Attaching the R ails to the Rack
6 Attach the rails to the rack:
Adjust the rail so that the flanges fit outside the C-shaped vertical rail.
Secure the rail using the supplied #12-24 Phillips head screws (four for each rail). Use the bottom
two holes for the front of the rail. Use the second and fourth holes for the back of the rail.
NOTE:
If the vertical rail has square holes, use a square nut (not supplied) with the supplied #12-24
Phillips-head screw.
Installation and Startup
|
11
Top 10 manuals
100.00
NZXT HALE90 1000W99.99
Samsung SM-R38099.97
AEG BSB 18C99.97
Dell 2700W99.97
Smeg KSEC70X99.96
Beurer HDE 4099.96
Pyramida KH 50 v.299.96
MSI CSM-H81M-P3299.96
AEG HR 562799.95
Melissa 640-048