Dell PowerEdge 2900: Installing the Power Cord Retention Bracket Turning on the System
Installing the Power Cord Retention Bracket Turning on the System: Dell PowerEdge 2900
Table of contents
- Notes, Notices, and Cautions
- System Features
- Supported Operating Systems
- Other Information You May Need Obtaining Technical Assistance Installation and Configuration
- Unpacking the System Installing the Rails and System in a Rack
- Connecting the Keyboard, Mouse, and Monitor Connecting the Power
- Installing the Power Cord Retention Bracket Turning on the System
- Installing the Bezel Complete the 0perating System Setup
- Technical Specifications Processor Expansion Bus Memory Drives
- Connectors Video Power Physical
- Physical (continued) Environmental

Installing the Power Cord Retention Bracket
Attach the power cord retention bracket on the right bend of the power supply handle. Bend the
system power cable into a loop as shown in the illustration and attach to the bracket’s cable clasp.
Repeat the procedure for the second power supply.
Turning on the System
Turn on the system and monitor (optional).
Press the power button on the system and the monitor. The power indicators should light.
Adjust the monitor’s controls until the displayed image is satisfactory.
8 Getting Started With Your System
Top 10 manuals
100.00
NZXT HALE90 1000W99.99
Samsung SM-R38099.97
AEG BSB 18C99.97
Dell 2700W99.97
Smeg KSEC70X99.96
Beurer HDE 4099.96
Pyramida KH 50 v.299.96
MSI CSM-H81M-P3299.96
AEG HR 562799.95
Melissa 640-048
