5. Installation Installation Installation Installation    

    

    

             

     

     

     Information for installers Information for installers Information for installers Information for installers    

Installation operations may only be performed by qualified and experienced personnel. 

Use suitable equipment and protective devices. Observe all accident prevention regulations. 

Always  refer  to  current  local  and/or  national  regulations,  legislation  and  bylaws  when  choosing  the 

installation site and making water and power connections. 

    

    

Prior to installation, read this operating manual, that of the electric pump, of the electrical panel (where 

applicable) and of any accessories. 

    

    

If the product shows evident signs of damage, do not proceed with installation, but contact the Technical Service Centre. 

5.1

5.1

5.1

5.1

Choosing the installation position

Choosing the installation position

Choosing the installation position

Choosing the installation position    

5.1.1

5.1.1

5.1.1

5.1.1

Installing the station inside a building

Installing the station inside a building

Installing the station inside a building

Installing the station inside a building    

Place  the  lifting  station  on  a  flat  and  level  surface  capable  of  bearing  the  weight  of  the  station  during 

operation. 

Leave at least 60 cm of free space around and above the station for installation and maintenance purposes. 

Fix the lifting station so that it cannot rotate. 

Protect  the  lifting  station  from  frost  and  ventilate  it  to  prevent  the  formation  of  toxic  and/or  flammable 

gases. 

Place  the  condenser  holder  and/or  electric  panel  in  a  sheltered  position,  observing  the  limits  indicated  in 

section 3.1. 

5.1.2

5.1.2

5.1.2

5.1.2

Installing the station outside a building

Installing the station outside a building

Installing the station outside a building

Installing the station outside a building    

Do not position the lifting station directly on the ground. The chosen area must not contain ground water or 

be  subject  to  flooding.  Fix  the  station  so  as  to  prevent  it  from  rotating  and  floating.  The  eyebolts  at  the 

bottom of the tank can be used. 

The  base  must  be  horizontal  and  capable  of  bearing  the  weight  of  the  station  while  it  is  operating. 

Depending on the characteristics of the ground it may be necessary to erect brick, prefab or concrete walls. 

Fill the space between the hole and station with sand and compress it. 

Protect the station from frost. 

Do not drive vehicles over the cover. 

Singlebox Plus / Doublebox Plus: in case of underground installation, the basin can withstand passing loads 

of 100 kg. 

Close the hole with a cover (manhole) or another method for simplifying subsequent maintenance operations. Erect signs indicating 

the presence of the station to avoid accidental damage. Leave enough space around and above the lifting station for installation and 

maintenance purposes. 

Place  the  condenser  holder  and/or  electric  panel  in  a  sheltered  position,  observing  the  limits  indicated  in 

section 3.1. 

After completing hydraulic and electrical connections, place clean sand around the basin to reduce any movements of the system 

and/or surrounding ground. 

5.1.3

5.1.3

5.1.3

5.1.3

Choosing the electric control panel

Choosing the electric control panel

Choosing the electric control panel

Choosing the electric control panel    

The station must be suitably protected against overloads and short circuits. 

Make sure the panel power ratings match those of the pump. Incompatible combinations may cause faults 

and fail to fully protect the motor. 

Always refer to the electric pump manual and the instructions accompanying the electric panel. 

    

6. Start Start Start Start----up up up up    

    

    

      

      

      

          Information for installers Information for installers Information for installers Information for installers    

    

    

Read this operating manual and the instructions for the electric pump and electric panel before start-up. 

Keep the manuals with care. 

Start-up operations must only be performed by expert and qualified staff and according to local regulations. 

Always refer to current local and/or national regulations, laws and standards. 

It is best to call in the Lowara Technical Assistance Service to start up the system. 

6.1

6.1

6.1

6.1

Hydraulic connections

Hydraulic connections

Hydraulic connections

Hydraulic connections    

Hydraulic connections may only be performed by qualified staff in compliance with current regulations. 

background image

en

en

en

en    

19 

The Midibox / Singlebox Plus / Doublebox Plus series of lifting stations are fitted with several piping access points. Depending on the 

type of installation and current local regulations, it may be necessary to fit a trap, check valve and/or tap on the pipe connecting the 

system to the public/private sewer or on other pipes. Always refer to current local and/or national regulations, laws and standards. It 

is always best to fit a check valve and an on/off valve upline and downline from the station. An installation example is shown in 

section 11.6. 

All the pipes must be installed in such a way that they are not subject to stress. The pipes must not stress the 

station. Make sure the electric pump is firmly attached to the pipes and that all the hydraulic connections are 

watertight. 

Where necessary, use suitable systems to prevent the transmission of vibrations and to protect the piping from icing up. 

6.1.1

6.1.1

6.1.1

6.1.1

Opening and preparing duct connections

Opening and preparing duct connections

Opening and preparing duct connections

Opening and preparing duct connections    

6.1.1.1

6.1.1.1

6.1.1.1

6.1.1.1

Midibox

Midibox

Midibox

Midibox    

Identify the connection for the duct you wish to open. Saw approximately 20 mm off the end of the duct and remove any burrs and 

residue material. 

6.1.1.2

6.1.1.2

6.1.1.2

6.1.1.2

Singlebox Plus / Doublebo

Singlebox Plus / Doublebo

Singlebox Plus / Doublebo

Singlebox Plus / Doublebox Plus

x Plus

x Plus

x Plus    

Identify the connection for the duct you wish to open. Remove the bottom of the connection and remove any burrs. Fit the relative 

gasket until the collar lies on the outer wall of the tank. 

6.1.2

6.1.2

6.1.2

6.1.2

Connection to the inlet piping

Connection to the inlet piping

Connection to the inlet piping

Connection to the inlet piping    

On the station, identify the location of the inlet duct, marked with the symbol 

. Open the duct and connect the inlet pipe so that 

it can drain on its own and so that incoming liquid does not affect operation of the float switches. Make sure the connection is 

watertight. 

Singlebox Plus / Doublebox Plus: there are several inlet ducts. 

6.1.3

6.1.3

6.1.3

6.1.3

Connection to the outlet piping

Connection to the outlet piping

Connection to the outlet piping

Connection to the outlet piping    

The stations are supplied with the outlet piping already connected to the pump. The outlet is marked by the symbol 

Check that the unions are correctly tightened and airtight. Connect the outlet piping to the unions on the outer wall of the station. 

Make sure the connection is watertight. Consult table 11.1 for information on the outlet pipe union. Attach the outlet pipe to the 

connection with the public/private sewer. Make sure the outlet line is fitted with a check valve compliant with EN 12056-4. 

6.1.4

6.1.4

6.1.4

6.1.4

Connection to the vent piping

Connection to the vent piping

Connection to the vent piping

Connection to the vent piping    

Remember to fit a vent pipe to prevent the build-up of flammable, explosive or toxic gases. 

On the station, identify the location of the vent duct, marked with the symbol 

. Open the duct and connect the vent pipe so that 

it can evacuate any condensation in the station. Make sure the connection is watertight. 

Depending on local regulations, different ratios between the outlet pipe and vent pipe diameters may apply. 

Make sure the vent outlet is outdoors (for example, above the ridge of the roof if the station is installed inside a building) and that 

the discharged gases cannot penetrate inside other buildings, rooms and the like. 

6.1.5

6.1.5

6.1.5

6.1.5

Connection to the eme

Connection to the eme

Connection to the eme

Connection to the emergency drain piping

rgency drain piping

rgency drain piping

rgency drain piping    

The bottom of the station is fitted with a connection for an emergency drain system, marked by the symbol 

. This connection can 

be used to connect a secondary pump (for example, a manual diaphragm pump) whose drain outlet must be independent from that 

of the electric pump inside the station. The manual pump is available as an optional kit. 

Identify the location of the duct at the bottom of the station, open the duct and connect the emergency drain pipe. Make sure the 

connection is watertight. 

6.1.6

6.1.6

6.1.6

6.1.6

Non

Non

Non

Non----return valve

return valve

return valve

return valve    

Fit a non-return valve in the piping connection to the public/private sewer. This will prevent backwash. If you choose a ball valve, 

check  whether  it  is  of  the  “sinking  ball  (heavy)”  or  “floating  ball  (lightweight)”  type,  as  the  installation  and  operating  conditions 

change. 

Install the valve at a distance of at least 1 metre from the lifting station to allow the liquid moved by the pump to open the valve 

shutter (unless otherwise indicated by the manufacturer). 

Always refer to current local and/or national regulations, laws and standards.  

6.1.7

6.1.7

6.1.7

6.1.7

Check valve

Check valve

Check valve

Check valve    

Install  a  check  valve  in  both  the  inlet  and  outlet  pipes  (connection  to  the  public/private  sewer).  This  will  enable  maintenance 

operations to be carried out without having to drain the entire system. Either gate valves or ball valves can be used.

6.1.8

6.1.8

6.1.8

6.1.8

Mounting the pump

Mounting the pump

Mounting the pump

Mounting the pump    

The electric pump is supplied assembled in the station. Make sure it is not damaged. Before start-up, remove any packaging clamps. 