Ridgid SF-2500: инструкция
Раздел: Электроинструменты
Тип:
Инструкция к Ridgid SF-2500

SF-2200
SF-2500
GB p. 1
DE p. 5
FR p. 9
NL p. 13
IT p. 17
ES p. 21
PT p. 25
SV p. 29
DA p. 33
NO p. 37
FI p. 41
HR p. 45
PL p. 49
RO p. 53
CZ p. 57
HU p. 61
GR p. 65
RU p. 69

1
Tools For The Professional
TM
SF-2200, SF-2500
SF 2500: Water must be sprayed between the pipe and the head using
the spray bottle to give better contact (Fig 3.1) and will speed the freezing
GB
process.
• Allow sufcient time for the ice plug to form (see table for approximate
freezing times) indicated by a sharp cracking sound from the pipe.
SF-2200, SF-2500
• Test the pipe for pressure by opening a valve or tting downstream by
installing a line tap. The pipe can now be serviced.
• The Super Freeze should be kept running during the service period.
Operating Instructions
• When the work is completed, switch off unit and remove line cord from
socket.
WARNING! Read these instructions and
Do not force the heads from the pipe to avoid damaging them.
• Let hoses defrost before storing in case.
the accompanying safety booklet carefully
• Wipe any moisture from the heads and the hoses before storing in the
before using this equipment. If you are un-
case.
certain about any aspect of using this tool, contact
your RIDGID distributor for more information.
To obtain the best freezing times:
• Check for good contact between head and pipe.
• Add Cool gel between adapter and pipe — head and adapter.
Failure to understand and follow all instructions
• Check if hose orientation is perpendicular towards pipe and the freeze
may result in electric shock, re, and/or serious
head is in one line with the hoses. (Fig 4.1 and Fig. 4.2) This is vital for
personal injury.
obtaining optimal freeze times.
• Connect freezing head to the top of a horizontal pipe section
SAVE THESE INSTRUCTIONS!
• Wrap insulation around head and pipe.
Note: Approximate freezing times shown in tables give an approximate guide
Specications:
for system temperatures between 15°C and 25°C.
The Super Freeze is designed for use as a pipe-freezing tool. We strongly
Faster freeze times will be obtained with Copper tubes.
recommend that it NOT be modied and/or used for any other application.
Any paint or dirt on the tube will increase the freeze time.
Physical characteristics, capacity and standard equipment: see g 1.1
(SF 2500) and 1.2 (SF 2200).
Troubleshooting:
• If heads do not become frosted:
Transport and handling:
Check power, check free air ow for fan and clean if required. Switch off
Avoid shocks or violent movements. Secure the unit rmly during transport.
power and wait 3-5 minutes before restarting.
Inspect the unit for signs of damage and fully uncoil hoses before connecting
• If heads get cold but will not freeze:
line cord to power supply.
Check for water ow in pipe.
• If unit stops: Wait 30 seconds before restarting.
Safety:
Note: The compressor is thermally protected and will reset automatically after
Caution: The freezing heads become very cold. Wear gloves to avoid risk of
an overload. If unit still does not function correctly and for all other maintenance
frostbite.
contact your RIDGID distributor.
Ground machine. Always plug the cord into a properly grounded socket.
Set up, positioning and operation:
• Stop water ow otherwise unit will not freeze ice plug.
• If possible allow the system to cool before freezing.
Warm water will cause circulation increasing the freeze time.
• Clean pipe and remove paint and insulating material.
• Connect freezing heads at same point for single ice plug or a suitable
distance for two separate plugs (Fig 2.1 and 2.2) using the cavity that
best ts the outside diameter of pipe.
Do not twist or kink hoses
• Switch on unit after ensuring there is unrestricted air circulation for the
fan.
After 2-3 minutes the heads will be at operating temperature.
SF 2200: Cool gel (cat.nr. 74946) must be applied:
1. Between the cylinder freezing head and the adapter.
2. Between the pipe and the adapter.
Cool gel will help speed up the process. (Fig. 3.2) Allows better contact for
faster freezing process.

2
Tools For The Professional
TM
SF-2200, SF-2500
Fig. 1.1 SF-2500 Fig. 1.2 SF-2200
Fig. 2.1 Fig. 2.2
Fig. 3.1 Spray bottle Fig. 3.2 Cool gel
Fig. 4.1 Fig. 4.2

3
Tools For The Professional
TM
SF-2200, SF-2500
Approximate freezing times SF-2200
Approximate freezing times SF-2500
60
45
30
MINUTES
15
0
13 (!) 19 (") 25 (1) 31 (1#) 38 (1!) 50 (2) 62 (2!)
Pipe Size, MM (INCHES)
-
T amb = 32 °C
-
T amb = 26 °C
-
T amb = 21 °C

4
Tools For The Professional
TM
SF-2200, SF-2500
SF-2200
SF-2500
23 kg.
31 kg
230V ~ 50.Hz 2.0 A 387W.
230V ~ 50 Hz - 2.4A - 505W
Pe1 = 20 bar
Pe1= 21 bar
Pe2 = 35 bar
Pe2= 34 bar
R 507 0,380kg.
R 507 0,487kg
ø max: Fe 2”. Cu 65 mm
ø max: Fe 2”. Cu 65 mm